A multi-job invoice lets you bill one client for several jobs on a single invoice. You don't need to raise and approve a separate invoice for each job. This saves time at month end and gives your client one clear document to pay. It works well for clients who run several jobs at once, or for clients who prefer one consolidated invoice each billing period.
This article explains how to create one invoice for multiple jobs from the client record.
Before you start
Check three things before you begin:
- Quoted value: every job you want to include must have a quoted value set.
- Same client: all the jobs must belong to the client you are invoicing.
- Ready to invoice: the jobs must still have value left to bill. You can't include jobs that are fully invoiced, written off or closed.
How to create a multi-job invoice
You build the invoice from the Jobs tab on the client record. Synergist creates a draft invoice for you. A draft invoice is one that has been created but not yet finalised, so you can still review and edit it.
- Open the client record for the client you want to invoice.
- Select the Jobs tab. This lists every job linked to that client.
- Tick the box on the left of each job you want to include.
- Choose Draft Invoice from the actions menu.
- Complete the draft invoice as usual, then send it for approval or make it real.
See Creating a draft invoice for a full breakdown of the invoice tabs and approval steps.
Tips
- Filter the Jobs tab by status before you start ticking. It makes it far easier to spot the jobs that are ready to bill.
- Check the Jobs/Phases invoiced tab on the draft before approving it. It confirms every job you selected has come through with the right value.
- If a job is missing a quoted value, add it on the job first. It won't invoice correctly without one.
- You can use the same approach to close several jobs at once by setting the invoice type to Write Off. See Closing a job.