The Advanced Quote Builder gives you full control over how estimate data turns into quote lines. Where the standard Build Quote options (Standard, Detailed, Summary) apply a fixed layout, the Advanced Quote Builder lets you choose exactly what's included, how it's ordered and how detailed it is, and lets you save your settings for next time.
Use it when a standard build doesn't quite fit, or when you regularly need the same custom quote layout and want to save it as a reusable view.
This article explains how the Advanced Quote Builder works, tab by tab.
Where to find it
- Open the job or phase.
- Go to the Quotes tab.
- Select the Actions button, then Advanced Quote.
This opens as a modal, made up of several tabs, so you can configure your quote without leaving the page.
View selector: a dropdown in the top-left of the modal. Use it to load an existing saved view, or leave it blank to start fresh.
General
The first tab controls the top-level build behaviour.
- Use Actual Values: a toggle that switches the quote from using estimated figures to actual recorded values, such as what's actually been spent or recorded on the job so far. When this is switched on, only actual values are pulled through. Estimate and PO (purchase order) line values are not included alongside them.
- Show items as packages: groups quote lines into the packages you've set up. This only appears if Packages are enabled in your system settings (File Maintenance). If you don't see it, ask your system administrator whether Packages are set up.
Order by
This tab controls the sort order of lines on the built quote, for example by phase or by cost type. Use it to make sure the finished quote reads in the order that makes most sense for the client.
Phase line Information
This tab controls how phase-level detail appears in the quote output. You choose a description type, either phase type or phase description, and then choose whether the detail pulled through is the phase comments or the phase description.
- Roll up to phase descriptions only: collapses all underlying time, purchase and expense detail into a single line per phase, showing only the phase description and total value.
- Full line detail: carries individual estimate line descriptions through to the quote, giving the client a more granular breakdown.
Roll up to phase level when the client only needs to see a total per phase. Use full line detail when they need to see the breakdown behind it.
Time / Materials & purchases Options
This tab controls which estimate line types are included in the quote, and at what level of detail:
- Time: choose how to show the estimated time (or actual, if you selected that earlier) in days or hours, and how the information is displayed by selecting one of the dropdown values in the Rollup section.
- Materials: include materials estimate lines.
- Purchases: include purchase estimate lines.
- Include PO lines: a sub-option of Purchases, which breaks the total down to individual PO lines rather than a single PO-level figure.
- Expenses: include expense estimate lines.
Saving and applying
Once your build is configured, choose how to apply it:
- Ad-hoc: run the build once, without saving the configuration.
- Save view: save the current settings as a named view. It then appears on the main Build Quote menu, ready for one-click use next time.
Use the Views button to manage your saved views:
- Rename a saved view
- Delete a saved view you no longer need
- Set a saved view as your default
Adding internal notes to estimate lines
Time, purchase, material and expense estimate lines each have an internal notes field, separate from the customer-facing Quote detail field. Use it to capture context, such as why a line was adjusted, without it appearing on the quote document the client sees.
Sending a quote for e-signature
Once your quote is built, you can send it for signature directly from the Quotes tab using Synergist's DocuSign integration, and track its status as it moves through the signing process.
Tips
- Save a view for any quote layout you build more than once. It saves you reconfiguring the same tabs from scratch every time.
- Use Use Actual Values when requoting a job partway through, rather than manually recalculating what's been spent.
- Roll up to phase level for client-facing quotes, and use full line detail for internal versions where you need to check the underlying numbers.
- Set your most-used saved view as the default, so it's the first option ready to go from the Build Quote menu.