Quote revisions let you save versions of a quote as you build it, so you always have a record of what was quoted, when, and by whom. Instead of overwriting a quote every time it changes, Synergist keeps each saved version as a read-only copy, building an audit trail you can look back on later.
This article explains how quote revisions work: how to save one, how to revert a quote to draft, and how to manage your saved versions.
Turning on quote revisions
Quote revisions is an optional feature, switched on in File Maintenance. Once enabled, it applies to every quote across your system.
Quote revisions can also work alongside Quote Approval, which adds a formal submit-and-approve workflow on top of revisions. Approval always requires revisions to be switched on first. Find out more about Quote approval.
Understanding the quote header
The quote header tells you the current state of the quote at a glance:
- Draft quote: the quote is editable and hasn't been saved as a revision yet.
- Quote 00001 – My first quote – <date & time>: the quote has been saved as a revision and is now read-only.
Saving a quote as a revision
A quote can only be edited while it's in Draft state. Once you save it as a revision, it becomes read-only.
- Open the Quotes tab on the job or phase. The header shows Draft quote.
- Build or edit your quote lines as normal.
- When the quote is ready, select Actions → Revisions, then either submit the current draft for approval (if that feature is switched on) or save the current draft.
- In the dialog that appears, give the revision a name so you can identify it later, for example "Initial quote" or "Revised after client call".
- Select Save.
The quote is written to the revisions table and becomes read-only. The Actions → Revisions option changes to Revert to Draft, and the revision becomes part of the quote's audit trail.
Reverting a quote to draft
If a saved quote needs amending, you'll need to revert it to draft first.
- Select Actions → Revert to Draft.
- In the dialog, add notes explaining why you're reverting. These notes are saved to the revision record.
- Select Actions → Revert to Draft again to confirm.
The quote lines are disassociated from the saved revision, though the revision record itself is kept. The header returns to Draft quote and the lines become editable again.
Undoing a revert to draft
Reverted a quote by mistake? Nothing is lost. The original revision stays in the revisions table, so you can reload it as the current quote.
Making a reverted revision current again returns its lines to read-only. If Quote Approval is on and the revision had been cancelled by the revert, its status resets automatically and the approver is alerted again.
Viewing and managing revisions
The full list of saved revisions is available from the Quotes tab. From here, you can browse previous versions and see their names and dates.
Revision comments support the # shortcut for inserting saved paragraphs, along with timestamp insertion. This is useful for logging notes against a specific revision as the quote evolves.
Tips
- Name revisions for what changed, not just the date. It makes the audit trail useful, not just complete.
- Remember a quote can only be edited in Draft state. If you can't edit it, check whether it's already been saved as a revision.
- Moving a phase preserves its quote revisions, so you can restructure jobs without losing your quote history.
- If you add a new phase to a job that already has quote revisions, the new phase's quote lines start out editable as normal.
- If your organisation needs a formal sign-off step before a quote goes to the client, pair revisions with Quote Approval rather than relying on revision names alone.